Does your car feel vague or unresponsive in corners?
Front Control Arm Lower-Front Bush Kit
SPF4008KThis bushing kit controls the fore and aft movement of the front control arm. SuperPro recommends it be replaced at the same time as the rear bushing. Note: re-use OE washers.
Quantity required: 1
Only 1 Left In Stock...Hurry!
For immediate despatch.
Kit Includes: 4 x Polyurethane Bushes, 2 x Steel Tubes
Front Control Arm Upper-Inner Bush Kit
SPF4944KThis bushing kit stabilises the movement of the front hub assembly and is critical in maintaining wheel alignment during cornering, braking and acceleration.
3
Anti-Roll Bar Mount Bush Kit
Petrol Models (not SRT)
SPF4764-33Ksuits Petrol Modelsavailable Sizes 33, 34 & 38mm Anti-Roll Bar mount bushes are an important part of the whole Anti-Roll Bar system. Worn or rubber bushes in these locations lead to movement in the Anti-Roll Bar in unwanted directions that effect the effectiveness of the Anti-Roll Bar. An upgrade to SuperPro bushings can return lost Anti-Roll Bar performance and improve handling.
Quantity required: 1
In Stock
For immediate despatch.
Fitment Difficulty:
Fitting Time: 1hr 30mins
SRT Models
SPF4764-38Ksuits SRT Modelsavailable Sizes 33, 34 & 38mm Anti-Roll Bar mount bushes are an important part of the whole Anti-Roll Bar system. Worn or rubber bushes in these locations lead to movement in the Anti-Roll Bar in unwanted directions that effect the effectiveness of the Anti-Roll Bar. An upgrade to SuperPro bushings can return lost Anti-Roll Bar performance and improve handling.
Quantity required: 1
In Stock
For immediate despatch.
Fitment Difficulty:
Fitting Time: 1hr 30mins
Rear Differential Mount Bush Kit
SPF4628KSuperPro hybrid bushings dramatically improve the mounting system of the differential. Reducing pinion angle changes during acceleration for smoother, more efficient power transfer through the drivetrain system.
Quantity required: 1
Only 1 Left In Stock...Hurry!
For immediate despatch.
Kit Includes: 3 x Polyurethane Bushes
Fitment Difficulty:
Fitting Time: 4hrs